Battery Optimizer
Build a digital twin of an energy system, choose the objective, and optimize operation or battery size.
INFINITAS PLATFORM
Build a digital twin of an energy system, choose the objective, and optimize operation or battery size.
Shared users, projects, data and reporting across future modules.
MODULES
Techno-economic analysis, dispatch, sizing and scenario comparison.
Market scenarios, price formation and portfolio analysis.
Network reinforcement, flexibility and resilience studies.
Sharing, settlement and collective investment analysis.
| Project | Location | System | Objective | Status | |
|---|---|---|---|---|---|
| Industrial site LjubljanaEdited today | Ljubljana, SI | Grid · Load · PV · Battery | Minimize bill | Ready | |
| Standalone BESS KoperEdited 2 days ago | Koper, SI | Grid · Battery | Market arbitrage | Draft | |
| PV plant MariborEdited 8 days ago | Maribor, SI | Grid · PV · Battery | Limit export | Calculated |
STEP 1 OF 4
Select only the components that exist in this project.
Used for location-aware data and calculations.
Click a card to add or remove an element.
STEP 2 OF 4
Choose one primary objective and optional technical constraints.
The optimization engine will prioritize this result.
Optional requirements that the solution must respect.
STEP 3 OF 4
Only inputs needed for the selected system and objective are shown.
STEP 4 OF 4
Confirm the system, objective and data sources.
Load, PV, grid and battery power
Before and after battery
Energy arbitrage €31.2k
Network charge €36.4k
PV utilization €7.2k
Electricity cost before and after optimization